Once the concept has been agreed the project moves into the next phase: engineering. In order to ensure a smooth project workflow the following key points must be clarified in good time and prepared thoroughly:

  • Planning of the building to reduce construction costs and construction time
  • Processes in the brewery to ensure operation free from infection
  • Pathways optimised for forklifts in order to optimise work processes
  • Storage of full and empty containers as well as raw materials such as malt and disinfectants
  • Preparation of assembly in order to minimise construction time and costs
  • Expansion potential, to ensure future expansions